Challenge:
  • Install roof with minimal impact on tenants due to the editorial department's need to work throughout the day and into the evenings.
  • Time constraints - PRI began working during the week, but was shut down due to editorial department's need for silence.
  • Limited access
  • Complete tear off couldn't be performed due to editorial department's noise constraints.
Solution:
  • Installed low impact, lightweight, fluid applied, odorless roof system that was least invasive on tenants.
  • To minimize impact on tenants, PRI began work at 7 p.m. on weekdays and weekends under lights and ended work at 7 a.m. the following mornings. Vacuuming of rooftop gravel was done between 3 and 6 am.
Success:
  • Installed a new, watertight, reflective roof in just eleven weekend days.
  • Upon completion of the project, Larry Benanti of the San Jose Mercury News raved, "Platinum Roofing performed one of the best roofing projects I have worked on."

// Featured Job

 
 909 Montgomery Street



// Platinum Edge

Buildings consume 40% of the world's total energy. Platinum Roofing services can help:

 >>lower utility costs
 >>promote environmentally effective
use of building materials
 >>provide long-term economic returns
 >>reduce environmental impact

Green Capabilities, Solar Installation Consultation, Certifications & Inspections, Roof Maintenance Programs.